Façade retention helps preserve existing building façades during demolition, refurbishment and redevelopment works. Temporary support keeps the external structure in place while internal elements are removed or modified. At Securak, our approach is tailored to the building, project requirements and surrounding site conditions.


Our service supports projects where an existing façade needs to be carefully retained during demolition, refurbishment or redevelopment.

Façade retention can be used across a range of refurbishment, redevelopment and demolition projects, including:
The approach is particularly relevant where an existing façade has architectural, historic or other value that needs to be preserved during redevelopment.

Our team combines practical demolition experience with careful coordination to support complex façade retention projects.

1. Site Assessment
We assess the existing façade, building condition, access and site constraints.
2. Project Planning
We plan the retention approach around the demolition and redevelopment sequence.
3. Support Installation
We install the required temporary support system in line with the project design.
4. Controlled Works
We carry out demolition or structural works while supporting the retained façade.
5. Monitoring
We inspect the façade and support system throughout the works where required.
6. Support Removal
We adjust or remove temporary supports once the permanent structure is ready.

Façade retention can provide an effective way to combine the preservation of an existing building exterior with modern redevelopment.

Façade retention may be required when an existing façade needs to remain in place during redevelopment, refurbishment or substantial internal demolition. It can also be used where architectural, historic or heritage features need to be preserved.
Façade retention can be suitable for commercial, residential, industrial, retail, mixed-use, historic and listed buildings. Suitability depends on the building condition, proposed works and project requirements.
The existing façade is assessed and supported using a suitable temporary works arrangement. Internal demolition then takes place in a controlled sequence while the required support is maintained and the façade is monitored where necessary.
There is no fixed duration for every project. Temporary supports generally remain in place for the required construction period and are adjusted or removed when the permanent structure is ready to provide the necessary support.
Send us your scope, drawings or programme. We’ll come back within one working day with a structured response and clear next steps.